Steel shopfronts in Ellon
Need a steel shopfront in Ellon? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Ellon?
Working in Ellon means working with Aberdeenshire Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Which glass should go in?
Safety glass is needed in doors, side panels and low-level panes. Laminated glass is worth the extra if the street has a history of break-ins.
Will this need planning permission in Ellon?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Aberdeenshire Council. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about steel shopfronts in Ellon?
How much does a steel shopfront cost in Ellon?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Do you cover the postcodes around Ellon?
Yes, including AB41.
Does a new shopfront in Ellon need planning permission?
A change to how the frontage looks usually does. Aberdeenshire Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Ellon?
What else can we do in Ellon?
Find out what your frontage will cost in Ellon
Answer four quick questions for a guide price, or book a free survey for a firm one.