0800 088 6248Get a guide price

Steel shopfronts in Dunstable

Steel shopfronts in Dunstable start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.

Guide price, plus VAT
£3,600 to £11,995
Lead time
5 to 6 weeks after drawing sign-off
Dark grey steel shopfront with slim glazing bars on a brick building

How does it work in Dunstable?

Working in Dunstable means working with Central Bedfordshire Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.

What should you check before you decide?

What about the fascia and sign?

We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.

How do you deal with the threshold?

We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.

Can I keep trading during the work?

Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.

What are the guide prices?

Guide prices by opening width
Opening widthTypical unitGuide price plus VAT
Up to 3 mA typical single shop unit£3,600 to £5,995
3 to 4 mA wider single unit£4,695 to £7,795
4 to 5 mA double-fronted or corner unit£5,895 to £9,695
5 to 6 mA large double unit£7,195 to £11,995

Guide prices, not offers. Your written quotation sets the final figure.

Will this need planning permission in Dunstable?

A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Central Bedfordshire Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.

What do people ask about steel shopfronts in Dunstable?

How soon can you fit a steel shopfront in Dunstable?

Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.

Does a new shopfront in Dunstable need planning permission?

A change to how the frontage looks usually does. Central Bedfordshire Council is the council to check with, and we advise at survey.

Can you add a shutter to the new shopfront?

Yes, and it is best planned now. We can price the frontage and shutter as one job.

How long does a steel shopfront take?

Usually 5 to 6 weeks after drawing sign-off.

Get your free survey booked

Enter the postcode of the shop.

Enter your name.

Enter a UK phone number.

Enter a valid email address.

Tick to confirm you have read the notice.

Surveys for new work are free. Repairs and servicing are charged. Nothing is ordered until you accept the quotation.

Find out what your frontage will cost in Dunstable

Answer four quick questions for a guide price, or book a free survey for a firm one.

WhatsApp
CallWhatsAppGuide price

We use optional cookies for analytics and live chat. They stay off unless you accept. Cookie policy

Live chat uses Tawk.to and sets cookies. Cookie policy