Steel shopfronts in Camden Town
Need a steel shopfront in Camden Town? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Camden Town?
Working in Camden Town means working with London Borough of Camden on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
Do you need consent in Camden Town?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from London Borough of Camden. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Camden Town?
Does a new shopfront in Camden Town need planning permission?
A change to how the frontage looks usually does. London Borough of Camden is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront in Camden Town?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Where else do we fit steel shopfronts near Camden Town?
What else can we do in Camden Town?
Find out what your frontage will cost in Camden Town
Answer four quick questions for a guide price, or book a free survey for a firm one.