Steel shopfronts in Ashford
Need a steel shopfront in Ashford? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Ashford?
Local rules matter more than people expect. Spelthorne Borough Council handles planning for Ashford, and its view of external shutters and frontage changes shapes what we recommend.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Do you need consent in Ashford?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Spelthorne Borough Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Ashford?
How much does a steel shopfront cost in Ashford?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Does a new shopfront in Ashford need planning permission?
A change to how the frontage looks usually does. Spelthorne Borough Council is the council to check with, and we advise at survey.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Ashford?
What else can we do in Ashford?
Find out what your frontage will cost in Ashford
Answer four quick questions for a guide price, or book a free survey for a firm one.