Steel shopfronts in Accrington
Shopfronts and Shutters UK fits steel shopfronts in Accrington, from £3,600 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Accrington?
Accrington sits in Lancashire, and Hyndburn Borough Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What should you think about first?
Which colours work best?
Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Accrington?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Hyndburn Borough Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Accrington?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Do you cover the postcodes around Accrington?
Yes, including BB5 and BB6.
How soon can you fit a steel shopfront in Accrington?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Accrington?
What else can we do in Accrington?
Find out what your frontage will cost in Accrington
Answer four quick questions for a guide price, or book a free survey for a firm one.