Shopfront and shutter packages in York
We fit shopfront and shutter packages in York from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in York?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including YO1, YO31 and YO10.
What makes the difference?
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in York?
Probably, if it is external. City of York Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in York?
Who decides planning for a frontage in York?
City of York Council is the planning authority. We tell you at survey what is likely to need consent.
Can you fit a package around my trading hours in York?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in York?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Is it cheaper to buy the shopfront and shutter together?
We price each part honestly and do not promise a discount. What you avoid is a second survey, a second visit, a second closure and a shutter box added after the event.
Where else do we fit shopfront and shutter packages near York?
What else can we do in York?
Find out what your frontage will cost in York
Answer four quick questions for a guide price, or book a free survey for a firm one.