Shopfront and shutter packages in Woking
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Woking. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Woking?
Our surveys in Woking cover postcodes including GU22, GU21 and GU23, along with Addlestone and Chertsey. Planning applications here go to Woking Borough Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What should you check before you decide?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Woking?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Woking Borough Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Woking?
Who decides planning for a frontage in Woking?
Woking Borough Council is the planning authority. We tell you at survey what is likely to need consent.
Can you fit a package around my trading hours in Woking?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Woking?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Woking?
What else can we do in Woking?
Find out what your frontage will cost in Woking
Answer four quick questions for a guide price, or book a free survey for a firm one.