Shopfront and shutter packages in Wigan
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Wigan. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Wigan?
Working in Wigan means working with Wigan Metropolitan Borough Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What makes the difference?
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Wigan?
An external shutter normally needs planning permission from Wigan Metropolitan Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Wigan?
Do you cover Wigan for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Wigan.
How long does a package take in Wigan?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Wigan?
Wigan Metropolitan Borough Council is the planning authority. We tell you at survey what is likely to need consent.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Wigan?
What else can we do in Wigan?
Find out what your frontage will cost in Wigan
Answer four quick questions for a guide price, or book a free survey for a firm one.