Shopfront and shutter packages in Tonyrefail
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Tonyrefail. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Tonyrefail?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including CF39, and we also work nearby in Tonypandy and Llantrisant.
What should you think about first?
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Tonyrefail?
An external shutter normally needs planning permission from Rhondda Cynon Taf County Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent, and rules are set by the Welsh Government.
What do people ask about shopfront and shutter packages in Tonyrefail?
Who decides planning for a frontage in Tonyrefail?
Rhondda Cynon Taf County Borough Council is the planning authority. We tell you at survey what is likely to need consent.
Do you cover Tonyrefail for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Tonyrefail.
How long does a package take in Tonyrefail?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Tonyrefail?
What else can we do in Tonyrefail?
Find out what your frontage will cost in Tonyrefail
Answer four quick questions for a guide price, or book a free survey for a firm one.