Shopfront and shutter packages in Thatcham
Want the frontage and shutter sorted in one go? We design and fit shopfront and shutter packages in Thatcham, from £3,895 plus VAT, starting with a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Thatcham?
A frontage in Thatcham has to suit the street as well as the shop. West Berkshire Council decides what is acceptable where planning applies, so we draw with that in mind.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Will this need planning permission in Thatcham?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so West Berkshire Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Thatcham?
Do you cover Thatcham for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Thatcham.
Who decides planning for a frontage in Thatcham?
West Berkshire Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Thatcham?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Thatcham?
What else can we do in Thatcham?
Find out what your frontage will cost in Thatcham
Answer four quick questions for a guide price, or book a free survey for a firm one.