Shopfront and shutter packages in Staines
Want the frontage and shutter sorted in one go? We design and fit shopfront and shutter packages in Staines, from £3,895 plus VAT, starting with a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Staines?
A frontage in Staines has to suit the street as well as the shop. Spelthorne Borough Council decides what is acceptable where planning applies, so we draw with that in mind.
What is worth knowing?
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Staines?
Probably, if it is external. Spelthorne Borough Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Staines?
Can you fit a package around my trading hours in Staines?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Staines for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Staines.
How long does a package take in Staines?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Staines?
What else can we do in Staines?
Find out what your frontage will cost in Staines
Answer four quick questions for a guide price, or book a free survey for a firm one.