Shopfront and shutter packages in Rochford
Want the frontage and shutter sorted in one go? We design and fit shopfront and shutter packages in Rochford, from £3,895 plus VAT, starting with a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Rochford?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including SS4 and CM0.
What makes the difference?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Rochford?
An external shutter normally needs planning permission from Rochford District Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Rochford?
Who decides planning for a frontage in Rochford?
Rochford District Council is the planning authority. We tell you at survey what is likely to need consent.
Do you cover Rochford for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Rochford.
How long does a package take in Rochford?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Rochford?
What else can we do in Rochford?
Find out what your frontage will cost in Rochford
Answer four quick questions for a guide price, or book a free survey for a firm one.