Shopfront and shutter packages in Prudhoe
If your shop in Prudhoe needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Prudhoe?
Local rules matter more than people expect. Northumberland County Council handles planning for Prudhoe, and its view of external shutters and frontage changes shapes what we recommend.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Will this need planning permission in Prudhoe?
Probably, if it is external. Northumberland County Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Prudhoe?
Can you fit a package around my trading hours in Prudhoe?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Prudhoe for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Prudhoe.
How long does a package take in Prudhoe?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Prudhoe?
What else can we do in Prudhoe?
Find out what your frontage will cost in Prudhoe
Answer four quick questions for a guide price, or book a free survey for a firm one.