Shopfront and shutter packages in Peterlee
Want the frontage and shutter sorted in one go? We design and fit shopfront and shutter packages in Peterlee, from £3,895 plus VAT, starting with a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Peterlee?
Whether the unit is on the main shopping street or a local parade in Peterlee, the job is measured the same way, and Durham County Council is the council to check with.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Do you need consent in Peterlee?
Probably, if it is external. Durham County Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Peterlee?
Can you fit a package around my trading hours in Peterlee?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Peterlee?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Peterlee for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Peterlee.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Peterlee?
What else can we do in Peterlee?
Find out what your frontage will cost in Peterlee
Answer four quick questions for a guide price, or book a free survey for a firm one.