Shopfront and shutter packages in Perry Barr
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Perry Barr. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Perry Barr?
Local rules matter more than people expect. Birmingham City Council handles planning for Perry Barr, and its view of external shutters and frontage changes shapes what we recommend.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Do you need consent in Perry Barr?
An external shutter normally needs planning permission from Birmingham City Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Perry Barr?
How much is a shopfront and shutter package in Perry Barr?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
How long does a package take in Perry Barr?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Perry Barr?
Birmingham City Council is the planning authority. We tell you at survey what is likely to need consent.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Perry Barr?
What else can we do in Perry Barr?
Find out what your frontage will cost in Perry Barr
Answer four quick questions for a guide price, or book a free survey for a firm one.