Shopfront and shutter packages in Lewes
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Lewes, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Lewes?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including BN7 and BN8.
What is worth knowing?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Lewes?
Probably, if it is external. South Downs National Park Authority decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Lewes?
Can you fit a package around my trading hours in Lewes?
Yes. Closed-day or out-of-hours fitting can be arranged.
Who decides planning for a frontage in Lewes?
South Downs National Park Authority is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Lewes?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Lewes?
What else can we do in Lewes?
Find out what your frontage will cost in Lewes
Answer four quick questions for a guide price, or book a free survey for a firm one.