Shopfront and shutter packages in Leeds
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Leeds. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Leeds?
Working in Leeds means working with Leeds City Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What is worth knowing?
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Leeds?
Probably, if it is external. Leeds City Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Leeds?
Can you fit a package around my trading hours in Leeds?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Leeds for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Leeds.
How long does a package take in Leeds?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Leeds?
What else can we do in Leeds?
Find out what your frontage will cost in Leeds
Answer four quick questions for a guide price, or book a free survey for a firm one.