Shopfront and shutter packages in Kenilworth
We fit shopfront and shutter packages in Kenilworth from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Kenilworth?
Kenilworth sits in Warwickshire, and Warwick District Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Do you need consent in Kenilworth?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Warwick District Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Kenilworth?
Can you fit a package around my trading hours in Kenilworth?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Kenilworth for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Kenilworth.
How long does a package take in Kenilworth?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Kenilworth?
What else can we do in Kenilworth?
Find out what your frontage will cost in Kenilworth
Answer four quick questions for a guide price, or book a free survey for a firm one.