Shopfront and shutter packages in Hendon
If your shop in Hendon needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Hendon?
Whether the unit is on the main shopping street or a local parade in Hendon, the job is measured the same way, and London Borough of Barnet is the council to check with.
What is worth knowing?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Hendon?
An external shutter normally needs planning permission from London Borough of Barnet. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Hendon?
Can you fit a package around my trading hours in Hendon?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Hendon for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Hendon.
How long does a package take in Hendon?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Hendon?
What else can we do in Hendon?
Find out what your frontage will cost in Hendon
Answer four quick questions for a guide price, or book a free survey for a firm one.