Shopfront and shutter packages in Halesowen
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Halesowen, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Halesowen?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including B62 and B63.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Do you need consent in Halesowen?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Dudley Metropolitan Borough Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Halesowen?
Can you fit a package around my trading hours in Halesowen?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Halesowen for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Halesowen.
How long does a package take in Halesowen?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Halesowen?
What else can we do in Halesowen?
Find out what your frontage will cost in Halesowen
Answer four quick questions for a guide price, or book a free survey for a firm one.