Shopfront and shutter packages in Gourock
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Gourock, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Gourock?
We aim to fit the survey around your opening hours in Gourock, and we also cover Greenock and Port Glasgow. You get the same written quotation wherever the shop is.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Will this need planning permission in Gourock?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Inverclyde Council will normally expect a planning application. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about shopfront and shutter packages in Gourock?
How much is a shopfront and shutter package in Gourock?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
How long does a package take in Gourock?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Gourock?
Inverclyde Council is the planning authority. We tell you at survey what is likely to need consent.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Gourock?
What else can we do in Gourock?
Find out what your frontage will cost in Gourock
Answer four quick questions for a guide price, or book a free survey for a firm one.