Shopfront and shutter packages in Dalbeattie
We fit shopfront and shutter packages in Dalbeattie from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Dalbeattie?
Our surveys in Dalbeattie cover postcodes including DG5, DG7 and DG6, along with Dumfries and Lockerbie. Planning applications here go to Dumfries and Galloway Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Do you need consent in Dalbeattie?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Dumfries and Galloway Council will normally expect a planning application. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about shopfront and shutter packages in Dalbeattie?
Do you cover Dalbeattie for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Dalbeattie.
Who decides planning for a frontage in Dalbeattie?
Dumfries and Galloway Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Dalbeattie?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Dalbeattie?
What else can we do in Dalbeattie?
Find out what your frontage will cost in Dalbeattie
Answer four quick questions for a guide price, or book a free survey for a firm one.