Shopfront and shutter packages in Clapham
We fit shopfront and shutter packages in Clapham from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Clapham?
A frontage in Clapham has to suit the street as well as the shop. London Borough of Lambeth decides what is acceptable where planning applies, so we draw with that in mind.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Do you need consent in Clapham?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so London Borough of Lambeth will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Clapham?
Do you cover Clapham for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Clapham.
Can you fit a package around my trading hours in Clapham?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Clapham?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Clapham?
What else can we do in Clapham?
Find out what your frontage will cost in Clapham
Answer four quick questions for a guide price, or book a free survey for a firm one.