Shopfront and shutter packages in Cinderford
If your shop in Cinderford needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Cinderford?
Local rules matter more than people expect. Forest of Dean District Council handles planning for Cinderford, and its view of external shutters and frontage changes shapes what we recommend.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Do you need consent in Cinderford?
An external shutter normally needs planning permission from Forest of Dean District Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Cinderford?
How much is a shopfront and shutter package in Cinderford?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
How long does a package take in Cinderford?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Cinderford for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Cinderford.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Cinderford?
What else can we do in Cinderford?
Find out what your frontage will cost in Cinderford
Answer four quick questions for a guide price, or book a free survey for a firm one.