Shopfront and shutter packages in Buckingham
If your shop in Buckingham needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Buckingham?
Our surveys in Buckingham cover postcodes including MK18 and NN12, along with Brackley and Bicester. Planning applications here go to Buckinghamshire Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What makes the difference?
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Buckingham?
An external shutter normally needs planning permission from Buckinghamshire Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Buckingham?
Who decides planning for a frontage in Buckingham?
Buckinghamshire Council is the planning authority. We tell you at survey what is likely to need consent.
Can you fit a package around my trading hours in Buckingham?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Buckingham?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Buckingham?
What else can we do in Buckingham?
Find out what your frontage will cost in Buckingham
Answer four quick questions for a guide price, or book a free survey for a firm one.