Shopfront and shutter packages in Broadstairs
We fit shopfront and shutter packages in Broadstairs from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Broadstairs?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including CT10.
What is worth knowing?
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Broadstairs?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Thanet District Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Broadstairs?
Can you fit a package around my trading hours in Broadstairs?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Broadstairs for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Broadstairs.
How long does a package take in Broadstairs?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Broadstairs?
What else can we do in Broadstairs?
Find out what your frontage will cost in Broadstairs
Answer four quick questions for a guide price, or book a free survey for a firm one.