Shopfront and shutter packages in Bath
If your shop in Bath needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Bath?
Local rules matter more than people expect. Bath and North East Somerset Council handles planning for Bath, and its view of external shutters and frontage changes shapes what we recommend.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Will this need planning permission in Bath?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Bath and North East Somerset Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Bath?
Do you cover Bath for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Bath.
Can you fit a package around my trading hours in Bath?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Bath?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Bath?
What else can we do in Bath?
Find out what your frontage will cost in Bath
Answer four quick questions for a guide price, or book a free survey for a firm one.