Perforated roller shutters in New Mills
Shopfronts and Shutters UK fits perforated roller shutters in New Mills, from £1,750 plus VAT, on a new frontage or the one you already have.
- Guide price, plus VAT
- £1,750 to £4,295
- Lead time
- 2 to 3 weeks after survey

What happens in New Mills?
Our surveys in New Mills cover postcodes including SK22 and SK23, along with Marple and Poynton. Planning applications here go to High Peak Borough Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,750 to £2,295 |
| 3 to 4 m | A wider single unit | £2,195 to £2,895 |
| 4 to 5 m | A double-fronted or corner unit | £2,695 to £3,495 |
| 5 to 6 m | A large double unit | £3,195 to £4,295 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
How is the shutter controlled?
By key switch, remote or both, and we specify a manual override for power cuts. Keep the override instructions somewhere that staff can find them.
Steel or aluminium laths?
Steel is stronger and heavier. Aluminium is lighter and quieter, which helps under flats. Most shops are well served by either.
Does a shutter need planning permission?
An external shutter usually does. Many councils resist solid external shutters, and some resist perforated ones too. An internal grille or shutter is usually the safer route, so we can advise what to check before you order.
Do you need consent in New Mills?
An external shutter normally needs planning permission from High Peak Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about perforated roller shutters in New Mills?
Do I need planning permission for a shutter in New Mills?
An external shutter usually needs it, and High Peak Borough Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
How soon can you fit a perforated roller shutter in New Mills?
Lead time is 2 to 3 weeks after survey. We agree the fitting day with you.
Are perforated shutters more likely to get planning permission?
Not reliably. Some councils accept them and others resist them, so check with your council before you order.
Where else do we fit perforated roller shutters near New Mills?
What else can we do in New Mills?
Find out what your frontage will cost in New Mills
Answer four quick questions for a guide price, or book a free survey for a firm one.