Perforated roller shutters in Arnold
We supply and fit perforated roller shutters in Arnold, starting with a free site survey. Guide prices start from £1,750 plus VAT.
- Guide price, plus VAT
- £1,750 to £4,295
- Lead time
- 2 to 3 weeks after survey

How does it work in Arnold?
A frontage in Arnold has to suit the street as well as the shop. Gedling Borough Council decides what is acceptable where planning applies, so we draw with that in mind.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,750 to £2,295 |
| 3 to 4 m | A wider single unit | £2,195 to £2,895 |
| 4 to 5 m | A double-fronted or corner unit | £2,695 to £3,495 |
| 5 to 6 m | A large double unit | £3,195 to £4,295 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
What will my insurer want?
Some insurers name a shutter type or rating, and many ask for locks and service records. Ask them before you order, as it saves a change later.
What about a fire exit?
A shutter must never trap people in. If it covers an escape route, it needs to be open while the premises are occupied, or opened easily from inside.
What electrics are needed?
A power supply near the box, installed by a qualified electrician. We show the position on the drawing.
Will this need planning permission in Arnold?
An external shutter normally needs planning permission from Gedling Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about perforated roller shutters in Arnold?
How soon can you fit a perforated roller shutter in Arnold?
Lead time is 2 to 3 weeks after survey. We agree the fitting day with you.
How much does a perforated roller shutter cost in Arnold?
For an opening up to 3 m wide, guide prices start from £1,750 plus VAT. The survey sets the final price.
Do I need planning permission for a shutter in Arnold?
An external shutter usually needs it, and Gedling Borough Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
Are perforated shutters as strong as solid ones?
Close to it. The holes are small and the lath keeps its shape, though a solid lath is still stronger.
Where else do we fit perforated roller shutters near Arnold?
What else can we do in Arnold?
Find out what your frontage will cost in Arnold
Answer four quick questions for a guide price, or book a free survey for a firm one.