Perforated roller shutters in Alsager
Need a perforated roller shutter in Alsager? We survey the opening, tell you what to check on consent, then make and fit it. Guide prices start at £1,750 plus VAT.
- Guide price, plus VAT
- £1,750 to £4,295
- Lead time
- 2 to 3 weeks after survey

How does it work in Alsager?
A frontage in Alsager has to suit the street as well as the shop. Cheshire East Council decides what is acceptable where planning applies, so we draw with that in mind.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,750 to £2,295 |
| 3 to 4 m | A wider single unit | £2,195 to £2,895 |
| 4 to 5 m | A double-fronted or corner unit | £2,695 to £3,495 |
| 5 to 6 m | A large double unit | £3,195 to £4,295 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
Do I need a safety edge?
That depends on the risk assessment. Powered shutters near the public are assessed against BS EN 12453, and we quote what the result calls for.
How long does a shutter last?
Curtains and guides can last many years with planned servicing. Motors, springs and locks go first, and a busy shop will wear them faster.
Steel or aluminium laths?
Steel is stronger and heavier. Aluminium is lighter and quieter, which helps under flats. Most shops are well served by either.
Will this need planning permission in Alsager?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Cheshire East Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about perforated roller shutters in Alsager?
How much does a perforated roller shutter cost in Alsager?
For an opening up to 3 m wide, guide prices start from £1,750 plus VAT. The survey sets the final price.
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Do I need planning permission for a shutter in Alsager?
An external shutter usually needs it, and Cheshire East Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
Are perforated shutters more likely to get planning permission?
Not reliably. Some councils accept them and others resist them, so check with your council before you order.
Where else do we fit perforated roller shutters near Alsager?
What else can we do in Alsager?
Find out what your frontage will cost in Alsager
Answer four quick questions for a guide price, or book a free survey for a firm one.