Insulated roller shutters across Hampshire
For insulated roller shutters across Hampshire, guide prices start at £1,850 plus VAT, and every job begins with a free site survey.
- Guide price, plus VAT
- £1,850 to £4,595
- Lead time
- 2 to 3 weeks after survey

What can you expect across Hampshire?
In Hampshire, the usual route is the same wherever you are: a measured survey, an itemised quotation, then fitting at a time that suits the shop. Towns we cover include Southampton, Portsmouth, Basingstoke and Gosport. Southampton and Portsmouth carry the big units, with Winchester, Romsey and Alton having older streets.
What should you think about first?
What will my insurer want?
Some insurers name a shutter type or rating, and many ask for locks and service records. Ask them before you order, as it saves a change later.
Steel or aluminium laths?
Steel is stronger and heavier. Aluminium is lighter and quieter, which helps under flats. Most shops are well served by either.
Can the shutter match my frontage?
Yes. Curtain, box and guides are powder coated to a RAL colour to match your frame as closely as the finish allows.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,850 to £2,495 |
| 3 to 4 m | A wider single unit | £2,395 to £3,095 |
| 4 to 5 m | A double-fronted or corner unit | £2,895 to £3,695 |
| 5 to 6 m | A large double unit | £3,395 to £4,595 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent across Hampshire?
An external shutter normally needs planning permission from your council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about insulated roller shutters across Hampshire?
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Do I need planning permission for a shutter across Hampshire?
An external shutter usually needs it, and your council decides. Many councils resist solid external shutters, and some resist perforated ones too.
How soon can you fit an insulated roller shutter across Hampshire?
Lead time is 2 to 3 weeks after survey. We agree the fitting day with you.
Are insulated shutters more secure?
Not in themselves. Their benefit is heat and noise rather than strength.
Find out what your frontage will cost across Hampshire
Answer four quick questions for a guide price, or book a free survey for a firm one.