Full frontage replacement across Surrey
We fit full frontage replacements across Surrey from £3,895 plus VAT, with strip-out priced at survey. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens across Surrey?
We work right across Surrey, including Woking, Guildford, Esher and Redhill. Rules on frontages and shutters differ from one council to the next. Councils here include Woking, Elmbridge and Reigate and Banstead. Guildford has its cobbled High Street, Woking and Epsom are busy centres, and Dorking and Reigate are smaller towns.
What makes the difference?
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
How much will it cost?
| Work | Guide price plus VAT |
|---|---|
| A new frontage, with strip-out of the old one priced at survey | £3,895 to £15,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission across Surrey?
Probably, if it is external. Your council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about full frontage replacements across Surrey?
Do you cover Surrey for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts across Surrey.
Who decides planning for a frontage across Surrey?
Your council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take across Surrey?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Will my shop be secure during the replacement?
We plan the sequence around that, and aim to leave the opening secure or boarded before anyone leaves site.