Full frontage replacement across South Glamorgan
Want the frontage and shutter sorted in one go? We design and fit full frontage replacements across South Glamorgan, from £3,895 plus VAT, with strip-out priced at survey, starting with a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work across South Glamorgan?
In South Glamorgan, the usual route is the same wherever you are: a measured survey, an itemised quotation, then fitting at a time that suits the shop. Towns we cover include Cardiff, Barry, Penarth and Llantwit Major. Cardiff has arcades and city-centre streets, with Barry and Penarth along the coast.
What are the guide prices?
| Work | Guide price plus VAT |
|---|---|
| A new frontage, with strip-out of the old one priced at survey | £3,895 to £15,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Do you need consent across South Glamorgan?
An external shutter normally needs planning permission from your council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent, and rules are set by the Welsh Government.
What do people ask about full frontage replacements across South Glamorgan?
How long does a package take across South Glamorgan?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can you fit a package around my trading hours across South Glamorgan?
Yes. Closed-day or out-of-hours fitting can be arranged.
Who decides planning for a frontage across South Glamorgan?
Your council is the planning authority. We tell you at survey what is likely to need consent.
Will my shop be secure during the replacement?
We plan the sequence around that, and aim to leave the opening secure or boarded before anyone leaves site.
Which towns do we cover in South Glamorgan?
Find out what your frontage will cost across South Glamorgan
Answer four quick questions for a guide price, or book a free survey for a firm one.