Full frontage replacement across Greater Glasgow
One drawing, one price and one fitting team: that is how we handle full frontage replacements across Greater Glasgow. Guide prices start at £3,895 plus VAT, with strip-out priced at survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens across Greater Glasgow?
Our teams cover Glasgow, Paisley, Greenock and Bearsden and the rest of Greater Glasgow. If your shop is in a conservation area or a listed building, tell us at the start, because it changes the options. Tenement ground floors run across Glasgow and Paisley, often as long rows of units under flats, and town centres line the Clyde.
What are the guide prices?
| Work | Guide price plus VAT |
|---|---|
| A new frontage, with strip-out of the old one priced at survey | £3,895 to £15,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Will this need planning permission across Greater Glasgow?
Probably, if it is external. Your council decides. Many councils resist solid external shutters, and some resist perforated ones too. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about full frontage replacements across Greater Glasgow?
Can you fit a package around my trading hours across Greater Glasgow?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Greater Glasgow for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts across Greater Glasgow.
How long does a package take across Greater Glasgow?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Will my shop be secure during the replacement?
We plan the sequence around that, and aim to leave the opening secure or boarded before anyone leaves site.
Find out what your frontage will cost across Greater Glasgow
Answer four quick questions for a guide price, or book a free survey for a firm one.