Electric roller shutters in Grimsby
Electric roller shutters in Grimsby start from £1,450 plus VAT, colour matched to your frontage, after a free site survey.
- Guide price, plus VAT
- £1,450 to £3,995
- Lead time
- 2 to 3 weeks after survey

What happens in Grimsby?
Working in Grimsby means working with North East Lincolnshire Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What should you check before you decide?
What electrics are needed?
A power supply near the box, installed by a qualified electrician. We show the position on the drawing.
Surface box or hidden box?
A surface box under the fascia is quicker and cheaper. A hidden box looks far better, but needs height above the door head and a removable access panel.
Does a shutter need planning permission?
An external shutter usually does. Many councils resist solid external shutters, and some resist perforated ones too. An internal grille or shutter is usually the safer route, so we can advise what to check before you order.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,450 to £1,995 |
| 3 to 4 m | A wider single unit | £1,895 to £2,595 |
| 4 to 5 m | A double-fronted or corner unit | £2,395 to £3,195 |
| 5 to 6 m | A large double unit | £2,895 to £3,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Grimsby?
Probably, if it is external. North East Lincolnshire Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about electric roller shutters in Grimsby?
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Do you cover the postcodes around Grimsby?
Yes, including DN32, DN31 and DN34.
Do I need planning permission for a shutter in Grimsby?
An external shutter usually needs it, and North East Lincolnshire Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
How long does a shutter take to fit?
Usually 2 to 3 weeks after the survey, and we agree the fitting day with you.
Where else do we fit electric roller shutters near Grimsby?
What else can we do in Grimsby?
Find out what your frontage will cost in Grimsby
Answer four quick questions for a guide price, or book a free survey for a firm one.