Aluminium shopfronts in Bow
Our aluminium shopfronts in Bow come with a free site survey, an itemised written quotation and a guide price from £2,450 plus VAT.
- Guide price, plus VAT
- £2,450 to £7,995
- Lead time
- 3 to 4 weeks after drawing sign-off

What can you expect in Bow?
A frontage in Bow has to suit the street as well as the shop. London Borough of Tower Hamlets decides what is acceptable where planning applies, so we draw with that in mind.
What should you think about first?
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £2,450 to £3,995 |
| 3 to 4 m | A wider single unit | £3,195 to £5,195 |
| 4 to 5 m | A double-fronted or corner unit | £3,995 to £6,495 |
| 5 to 6 m | A large double unit | £4,795 to £7,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Bow?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to London Borough of Tower Hamlets. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about aluminium shopfronts in Bow?
Do you cover the postcodes around Bow?
Yes, including E3 and E14.
How soon can you fit an aluminium shopfront in Bow?
Lead time is 3 to 4 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does an aluminium shopfront take?
Usually 3 to 4 weeks from drawing sign-off to fitting. Your quotation sets out the fitting days.
Where else do we fit aluminium shopfronts near Bow?
What else can we do in Bow?
Find out what your frontage will cost in Bow
Answer four quick questions for a guide price, or book a free survey for a firm one.