Aluminium shopfronts in Ashtead
Shopfronts and Shutters UK fits aluminium shopfronts in Ashtead, from £2,450 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £2,450 to £7,995
- Lead time
- 3 to 4 weeks after drawing sign-off

What happens in Ashtead?
A frontage in Ashtead has to suit the street as well as the shop. Mole Valley District Council decides what is acceptable where planning applies, so we draw with that in mind.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £2,450 to £3,995 |
| 3 to 4 m | A wider single unit | £3,195 to £5,195 |
| 4 to 5 m | A double-fronted or corner unit | £3,995 to £6,495 |
| 5 to 6 m | A large double unit | £4,795 to £7,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
Do you need consent in Ashtead?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Mole Valley District Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about aluminium shopfronts in Ashtead?
How soon can you fit an aluminium shopfront in Ashtead?
Lead time is 3 to 4 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Does a new shopfront in Ashtead need planning permission?
A change to how the frontage looks usually does. Mole Valley District Council is the council to check with, and we advise at survey.
How long does an aluminium shopfront take?
Usually 3 to 4 weeks from drawing sign-off to fitting. Your quotation sets out the fitting days.
Where else do we fit aluminium shopfronts near Ashtead?
What else can we do in Ashtead?
Find out what your frontage will cost in Ashtead
Answer four quick questions for a guide price, or book a free survey for a firm one.