Shopfronts and shutters in Northfield
If your shop in Northfield needs a new front, a new shutter or both, we can survey it, draw it, price it and fit it under one contract.

How do we work in Northfield?
Our base is at Great Barr in Birmingham, so this is home ground for us. We cover postcodes including B31, B38 and B45 here. For planning you will be dealing with Birmingham City Council, and we also work in Selly Oak and Kings Heath.
What can we do in Northfield?
| Service | Price plus VAT |
|---|---|
| Shutter servicing | Fixed £145 |
| Vision roller shutters | From £2,195 |
| Aluminium shopfronts | From £2,450 |
| Shopfront repairs | £165, first hour included |
| Insulated roller shutters | From £1,850 |
| High-security shutters | From £3,995 |
| Steel shopfronts | From £3,600 |
| Perforated roller shutters | From £1,750 |
| Electric roller shutters | From £1,450 |
| Shopfront and shutter packages | From £3,895 |
| Shutter repairs and servicing | Quoted after inspection |
| Frameless glass shopfronts | From £4,995 |
What is worth knowing before you start?
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
How do I stop it happening again?
Most failures give a warning: noise, slow running, a door that needs a push. A planned service catches these early.
Do you need consent in Northfield?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Birmingham City Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask?
Do you cover Northfield?
Yes. We survey and fit here, and the survey for new work is free.
Which council handles planning in Northfield?
Birmingham City Council. We tell you at survey whether your work needs consent.
Who decides planning for a frontage in Northfield?
Birmingham City Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Northfield?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Which towns are nearby?
Find out what your frontage will cost in Northfield
Answer four quick questions for a guide price, or book a free survey for a firm one.