Shopfronts and shutters in Dunblane
For Dunblane, we offer one route for the whole frontage: one surveyor, one drawing, one written quotation and one team on fitting day.

How do we work in Dunblane?
Planning here sits with Stirling Council. Nearby places include Stirling and Tullibody, and we cover postcodes including FK15 and FK17.
What can we do in Dunblane?
| Service | Price plus VAT |
|---|---|
| Shopfront repairs | £165, first hour included |
| Insulated roller shutters | From £1,850 |
| High-security shutters | From £3,995 |
| Frameless glass shopfronts | From £4,995 |
| Steel shopfronts | From £3,600 |
| Perforated roller shutters | From £1,750 |
| Vision roller shutters | From £2,195 |
| Aluminium shopfronts | From £2,450 |
| Shopfront and shutter packages | From £3,895 |
| Shutter repairs and servicing | Quoted after inspection |
| Electric roller shutters | From £1,450 |
| Shutter servicing | Fixed £145 |
What else should you know?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Will I get something in writing?
Yes. A service visit ends with a written condition report that you can keep for your landlord or insurer.
Will this need planning permission in Dunblane?
An external shutter normally needs planning permission from Stirling Council. An internal shutter or grille often does not, so it is worth checking before you order. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask?
Do you cover Dunblane?
Yes. We survey and fit here, and the survey for new work is free.
Which council handles planning in Dunblane?
Stirling Council. We tell you at survey whether your work needs consent.
How long does a package take in Dunblane?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Dunblane?
Stirling Council is the planning authority. We tell you at survey what is likely to need consent.
Which towns are nearby?
Find out what your frontage will cost in Dunblane
Answer four quick questions for a guide price, or book a free survey for a firm one.