Free site survey · Written quotation0800 088 6248WhatsApp

Staffordshire

Steel shopfronts across Lichfield

Steel shopfronts in Lichfield start from about £3,600 plus VAT for a standard opening, with a free survey and a written quotation before anything is ordered.

Across Lichfield, we survey the opening before any price is given and the steel shopfronts are then made to those dimensions.

Permission and Lichfield District Council

Lichfield District Council decides planning in Lichfield. Like-for-like work rarely needs consent, though external shutters and lit signs normally need approval. We flag it at survey so it never delays the fit.

Price guide

The entry price is about £3,600 plus VAT. Width, height, finish and access move the final figure. Quotations stay valid for 90 days.

How long it takes

Allow 5-6 weeks after drawing sign-off from drawings to delivery. Fitting a standard Lichfield unit is normally one to two days on site. We can fit on a day the business is shut.

Specification notes

Steel takes an impact that aluminium will not, so it is the usual choice for units that have been targeted before or that sit on a late-night street. You can specify laminated glass options for attack resistance; crittall-style glazing bar patterns.

Where we work around Lichfield

Our Lichfield jobs sit within Staffordshire including the WS postcodes, with regular work in neighbouring Rugeley, Leek and Stone.

Common questions

How much does steel shopfronts cost in Lichfield?

Steel shopfronts start from around £3,600 plus VAT for a standard opening. The exact figure depends on the width, height, finish and access, and comes from a free site survey as a written, itemised quotation.

Do I need planning permission in Lichfield?

Like-for-like replacements usually do not. Changing the appearance of the frontage, fitting an external roller shutter or adding an illuminated sign usually needs consent from Lichfield District Council. We tell you which applies at survey.

How long does it take?

Lead time for steel shopfronts is typically 5-6 weeks after drawing sign-off. Installation itself is usually one to two days on site for a standard unit.

Can you work outside trading hours?

Yes, work can be arranged for a closed day or outside trading hours where the business cannot close. We agree it with you when booking.

Close to Lichfield:

Other work we do in Lichfield:

CallFree survey